50 years of stand building
Eldee Expo Experts. The full-service stand builder
Exhibition stand builder
Messe Essen
We help you make your trade show a success
Looking for a stand builder at Messe Essen? Eldee Expo Experts designs and builds exhibition stands in Essen for shows such as IPM Essen, E-world and SCHWEISSEN & SCHNEIDEN. Essen is one of the closest German exhibition cities to our workshop in the Netherlands, and we travel there with our own trucks and crew. Since 1976 we have completed more than 5,500 projects.
Messe Essen at a glance
| Address | Norbertstraße 2, 45131 Essen, Germany |
| Halls | halls 1 to 8, Galeria and Grugahalle |
| Hall height | 6 to 16 metres, depending on the hall |
| Maximum stand height | 6 metres in most halls |
| Floor load | 20 kN/m² in the halls |
| Public transport | U-Bahn U11 to Messe Ost/Gruga or Messe West/Süd/Gruga |
Building at Messe Essen
In halls 1, 2, 3, 5, 6, 7, 8, the Galeria and the left section of hall 4 you can build up to 6 metres. In hall 1A and the right section of hall 4 the limit is 4.50 metres. The Grugahalle foyer has lower limits.
A single-storey stand within the guidelines needs no submission. A two-storey stand, a special structure or a vehicle used as a stand does, at least six weeks before build-up. A second storey needs a structural calculation, a building description, drawings at 1:100 and an escape route plan, and it must have a sprinkler system.
Decoration materials must meet at least fire class B1. Rear walls above 2.50 metres facing neighbours must be finished in neutral white. Advertising aimed at a neighbouring stand must keep at least 3 metres distance unless the neighbour agrees in writing.
A second storey in Essen takes more than a calculation. Mention it in your briefing and we include the sprinklers and escape route plan from the start.
Build-up and dismantling
Build-up and dismantling times are listed in your show's manual. Because Essen is close to the Netherlands, we can run crews in shifts on large stands without long hotel stays.
You order electricity, water, internet and suspension points from Messe Essen. We track those deadlines and prepare the orders for you in the ordering portal.
Always stand out, wherever you exhibit, with a stand by Eldee.
Trade shows at Messe Essen where we build
Essen hosts shows for horticulture, energy, welding and security. A selection:
Horticulture
IPM Essen
Energy and water
E-world energy & water
Welding and metal
SCHWEISSEN & SCHNEIDEN
Security
security essen
Automotive
Essen Motor Show
Consumer shows
SPIEL Essen · Reise + Camping
Is your show not listed? We build at every show in Essen.
Also nearby: Messe Düsseldorf
What we arrange at Messe Essen
Essen is close to the Dutch border, so our trucks drive there directly without transshipment. We check that your design fits your hall's 6 or 4.50 metre limit, handle structural calculations, sprinklers and escape route plans for a second storey, and prepare your orders with Messe Essen. That is how we approach stand construction abroad: one team and one schedule, from workshop to hall.
FAQ
Frequently asked questions about stand building at Messe Essen
How high can your stand be, when do you need approval and what applies to a second storey? Messe Essen has strict rules on second storeys and advertising aimed at neighbours. Below are the answers, based on the Messe's technical guidelines.
Eldee Expo Experts, based in Tricht in the Netherlands, builds exhibition stands at Messe Essen for shows such as IPM Essen, E-world and SCHWEISSEN & SCHNEIDEN. Essen is one of the closest German exhibition cities for us, which keeps logistics simple.
In most halls 6 metres: halls 1, 2, 3, 5, 6, 7, 8, the Galeria and the left section of hall 4. In hall 1A and the right section of hall 4 the limit is 4.50 metres. A show can set different rules, so we always check its manual too.
A single-storey stand within the guidelines does not. A two-storey stand, a special structure or a vehicle used as a stand does. Documents must arrive at least six weeks before build-up. We handle the submission.
A structural calculation, a building description, drawings at 1:100 and an escape route plan. The upper level needs a sprinkler system, and an open upper deck requires the neighbouring stand’s consent. We handle the full submission.
Decoration materials must be at least B1 under DIN 4102-1, or C-s2,d0 under EN 13501-1, and non-dripping. Load-bearing fixings must be non-combustible. Our standard materials meet these requirements.
Custom stands start at about €400 per m², excluding transport and travel to Essen. Floor space, electricity, water and suspension points are paid separately to Messe Essen. Because Essen is close by, transport and travel costs stay limited. Exhibiting in Essen more often, for example at E-world and security essen? A modular stand you reuse is then often the cheaper choice.
Exhibiting in Essen soon?
I'm happy to think along about your stand and the Messe's rules.
Christie
Management Assistant
Call +31 (0)345 585 600